1 |
Filling gas |
LPG |
2 |
Overall dimension |
13600*2540*4000mm |
3 |
Curb weight |
14000kg |
4 |
Loading weight |
26000kg |
5 |
Axles |
13T HCSV brand with ABS & 3 units |
6 |
Tire |
12.00R22.5 12PR & 12 units |
7 |
Rim |
9.0*12 units |
8 |
Pin |
Jost Brand & 50# or 90# |
9 |
Loading leg |
Jost Brand & 28T |
10 |
Suspension |
Leaf Spring 13*90*10 |
LPG tank specification |
11 |
Tank capacity |
61900L |
12 |
Tank material |
16MnR |
13 |
Overall dimension |
Φ2532*13380mm |
14 |
Filling rate |
95.00% |
15 |
Tank Designed thickness |
End cover: 8mm |
Tank body: 10mm |
16 |
Design temperature |
-40~50 °C |
17 |
Working temperature |
-40~50 °C |
18 |
Corrosion allowance |
1.0mm |
19 |
Designed pressure |
1.61/0.04Mpa |
20 |
Hydraulic test pressure |
2.10Mpa |
21 |
Leak test pressure |
1.61Mpa |
22 |
Heat treatment |
Wholly get rid of stress |
Main Part specification |
23 |
Liquid level meter |
Type: ZGM-25-20 |
Model: Rotary type |
Nominal pressure: PN2.5Mpa |
Surveying range: 0~2512mm |
Precision: 2.5Grade |
24 |
Emergency cutting valve |
Type: QGJ43F-2.5-8 |
Gas phase: QGJ43F-2.5-8 |
Liquid phase: DN50mm |
Operation way: Mechanical |
Closing time: ≤5 Sec |
Melting switch temperature: 75±5° C |
Type: A412F-2.5-16 |
25 |
Safe valve |
Model: Inner full lift |
Nominal pressure: PN2.5 MPa |
Nominal diameter: DN80mm |
Set pressure: 1.72 MPa |
Re-seating pressure: ≥1.55 MPa |
Rated relieving pressure: ≤1.93 MPa |
Valve type: Gas phase Q41F-25P-8B |
Liquid phase: Q41F-25P-8B |
26 |
Inlet and outlet |
Model: Quick tie-in |
Nominal Diameter: Gas phase DN25mm |
Liquid phase: DN50mm |
Nominal diameter (mm): 50 |
27 |
explosion-proof flow meter |
Nominal pressure(mpa): 4 |
medium temperature(°C): -40~150 |
Body material: 1Cr18Ni9Ti |
Allow the vibration acceleration: 1.0~2.0g |
precision: ±1% |
supply voltage: DC +12V, DC +24V |
explosion-proof sign: flame-proof type: Exd II CT2-T5 |
environmental conditions: temperature -20°C ~55°C,relative humidity5%~90%,atmospheric pressure 86kPa~108kPa gas,liquid,steam |
applicable medium |
|
|
Other equipment |
1. |
Single tool box, largest as possible as we can. |
2. |
Single valve box, largest as possible as we can. |
3. |
Single side loading and unloading on left. |
4. |
2 sets of 8KG fire extinguisher and boxes. |
5. |
1set of anti-static grounding tape. |
6. |
All of other necessary tools. |